Client | Department of Planning, Infrastructure and Logistics, Northern Territory |
---|---|
Date | 2019 |
Client: Northern Territory Government
Date: 2022 – 2023
Exact have collaborated with Aurecon to deliver the design and construction of Stage 1 (48kms) and Stage 2 (77kms) of the Carpentaria Highway Upgrade. As this road transport system is critical for the economic growth of the country, replacing the existing single-lane seal with a dual-lane 10m wide carriage aims to vastly improve the safety for the users and decrease travel time for members of remote communities.
The road upgrade was designed with the use of LIDAR surveying and hydrological modelling to ensure that the drainage installed and upgraded was able to increase the flood immunity throughout the wet season.
As of November 2023, the design works and construction from Ch. 2.00km to Ch. 50.00km has been completed.
Key achievements throughout the project include: