Client | Aroona Farms SA |
---|---|
Date | 2017 |
Client: SRWRA
Date: 2019
Exact Contracting mobilised to Seaford Rise in October 2019 to construct a 600ML storage for the Willunga Water Basin.
The dam is a part of a significant sustainable resource management project to hold reclaimed water that was historically pumped from Christies Beach into the Gulf St Vincent. Expanding recycled water supply to the region reduces the stress on the local aquifers, diverts this water away from the ocean, and provides greater water security for the region.
Initial challenges were the project’s tight construction deadline, as well as operating within an urban environment ensuring adequate controls were in place so that the surrounding community were minimally impacted.
The short construction timeframe was required to utilize the drier summer months and enable commissioning of the dam to allow enough time to start accepting recycled water throughout winter to service the Mclaren Vale wine region throughout the growing season of 2020.
Key achievements throughout the project:
Client | Aroona Farms SA |
---|---|