Exact Contracting Exact Contracting Exact Contracting Exact Contracting
  • About
    • About Us
    • The Board
    • Community
    • Accreditations
  • Projects
  • Services
    • Civil
    • Mining
    • Water Infrastructure
    • Agricultural Services
  • Quality, Safety + Environment
  • Careers
  • Contact
  • Purchasing T’s & C’s
Exact Contracting Exact Contracting
  • About
    • About Us
    • The Board
    • Community
    • Accreditations
  • Projects
  • Services
    • Civil
    • Mining
    • Water Infrastructure
    • Agricultural Services
  • Quality, Safety + Environment
  • Careers
  • Contact
  • Purchasing T’s & C’s

Civil

Exact Contracting

Tanami Road – Upgrade + Seal

Exact Contracting were engaged by the Northern Territory Government to upgrade 149 kilometers of the Tanami Road. These works consist of Stage 1 (58km), upgrading existing alignment and sealing between... read more →
  • 2024
  • Luke Evans

Carpentaria Highway – Upgrade + Seal

Exact have collaborated with Aurecon to deliver the design and construction of Stage 1 (48kms) and stage 2 (77kms) of the Carpentaria Highway Upgrade to replace the existing single-lane seal... read more →
  • 2024
  • Luke Evans

SRWRA 600ML Storage, Seaford Heights – Willunga Water Basin

Exact Contracting mobilised to Seaford Rise in October 2019 to construct a 600ML storage for Willunga Water Basin, Water Utilities Australia. The dam was built to hold reclaimed water that... read more →
  • 2020
  • Ainsleigh Bilato

OZ Minerals – Carrapateena Tailings Storage Facility Project

OZ Minerals engaged Exact Contracting to construct stage 1 of their cross valley tailings storage facility (TSF) at their recently established Carrapateena copper/gold mine, north-east of Port Augusta, South Australia.... read more →
  • 2019
  • Ainsleigh Bilato

Keep River Plains Road Upgrade Stage 1 and Stage 2 Ch0 to CH26.7

The Keep River Plains Road is located approximately 55kms outside of Kununurra on the NT/WA Border. This project is a federally funded project that requires federal safety accreditation and compliance... read more →
  • 2019
  • Ainsleigh Bilato

Berrimans & Carlsfield Dams

Two dams at Quelltaler Estate (formally Annie’s Lane) Watervale, were reshaped and upgraded using surrounding vineyards as borrow areas for additional embankment material. The Berrimans dam was upgraded to store... read more →
  • 2019
  • Ainsleigh Bilato

Hill Dam

Exact Contracting was engaged to construct a 680 megalitre water storage dam in the Barossa Valley. The site, which was previously a vineyard, was cleared to make way for the... read more →
  • 2019
  • lauren

Auburn Terra Rossa Storage

Exact Contracting was engaged by Seppeltsfield Wines to construct a 500 megalitre storage dam for their vineyard development at Auburn in the Clare Valley. The dam construction commenced in late... read more →
  • 2019
  • lauren

Tjukaruru Road – Upgrade and Seal 8.08km

Exact Contracting was engaged by the Department of Planning, Infrastructure and Logistics, Northern Territory for the upgrade and seal of 8.08km of Tjukaruru Rd, heading west from Kata Tjuta and... read more →
  • 2018
  • lauren

Finke Airstrip

Exact Contracting were engaged by the Department of Planning Infrastructure and Logistics for the upgrade and seal of the Finke Aerodrome at the Finke Community approximately 250kms south of Alice... read more →
  • 2017
  • rachel
  • 1
  • 2

Next Page »

ADELAIDE

Support Services
43 Greenhill Road
Wayville SA 5034
Phone (08) 8372 1100
Fax (08) 8372 1199

DARWIN

20 Pruen Road
Berrimah NT 0828

ALICE SPRINGS

40 Priest Street
Alice Springs NT 0871

PURCHASING & TRANSPORT

43 – 47 Hawker Road
Burton SA 5110
Phone (08) 8280 3220
Fax (08) 8280 3224

QUALITY, SAFETY & ENVIRONMENT

© Exact Contracting. All Rights Reserved. Developed by Avenue De Saxe.